Thai PBS Thai PBS
Heavy lifting machinery resumes work at collapsed SAO building

Heavy lifting machinery resumes work at collapsed SAO building

14 Sept 02:44 Key points summarised by AI
  • Heavy machinery, including huge cranes, resumed lifting concrete blocks at the collapsed SAO building after manual digging efforts failed to reach a reported cavity.
  • 128 tanks of gas were transported to the site for oxy-acetylene cutting of rebar, aiming to facilitate the ongoing search operations.
  • No survivors or bodies were recovered today, leaving the death toll at 15 and 72 people still missing under the debris.
Read full article
News 1/1
Skip > Skip >