Thai PBS Thai PBS
PM says controversial land bridge project can wait

PM says controversial land bridge project can wait

14 Sept 20:48 Key points summarised by AI
  • Prime Minister Anutin Charnvirakul announced the controversial land bridge project can be delayed, prioritizing upgrades to existing seaports in Ranong and Chumphon.
  • Despite the delay, the land bridge remains a flagship policy, with further studies continuing; however, urgent land-based logistics infrastructure connecting Ranong and Chumphon remains a key objective.
  • A prominent business leader suggested a 5-10 year delay, advocating for a rail link first, while approximately 400 local residents protested the projects, citing environmental concerns and doubts about economic benefits.
  • The proposed one-trillion-baht land bridge aims to link deep-sea ports in Chumphon and Ranong via an 89km motorway, dual-track railway, and oil pipelines to bypass the congested Strait of Malacca.
Read full article
News 1/1
Skip > Skip >